Client contracts
for asbestos survey to
be carried out prior to
conducting refurbishment
or maintenance works,
as per clients
specification.
Suspected
asbestos samples
analysed in lab
with results added
to survey data.
Plans drawn
with asbestos
locations added to
online risk management
software, NexGen.
Report quality control
check.
Client given free
access to NexGen.
Reports of hazards
issued to client via
NexGen in real time.
Client decides
whether to leave
asbestos in situ or
remove asbestos.
View HSE Guide
(HSG 264).
Client tenders
and appoints removal
contractor and asbestos
analyst. Contractor to
inform HSE 14 days prior
to work commencement
-ASB5 notification.
Removal
contractor restricts
access and creates a
safe working area.
HSG 247 Asbestos:
The licensed
contractors guide
Contractor
starts removal process
whilst asbestos analyst
conducts air monitoring
throughout.
Once works are
finished, asbestos analyst
conducts a 4 stage
clearance with optional
SEM testing.
Once
compliance
met, contractor
removes work area
and 'Certificate for
Reoccupation' issued
with NexGen
updated.
Client check
specification has
been met and
updates building
records.
Client can start
building works
knowing they are
compliant and the risk
from asbestos exposure
has been adequately
handled.
NexGen
Asbestos Removal
Timeline Want to know more? Speak to our team